Tuesday, August 30, 2011

Welcome To the Hub Of all Electrical Essentials Ever!!!!!!

Hey Everyone (By this I meant all Electricals Of CET 07 batch..If u aren't BuZZ OFF!!!)
This is a small Venture planned Danny & Rince jointly mainly because EEE works are Hardwork!! United We stand,Divided We Fall!! In this blog you can find all the essential things required by a EEE student. It includes Lab Materials, Records, Sessional marks, Lab Manuals, Study Materials, Question papers,Timetables and some important photos & videos of many instruments,experiments etc. If u possess any lab Manuals,Study Materials,Question Papers etc we would be delighted to publish them. You can send it to danny.johnkurian@gmail.com or rince999@gmail.com. We welcome your Suggestions and comments on this blog. We will do our best to make all material available on the blog as link. So people please do submit any stuff that u have.... Good Luck to a great Cooperative Final Semester!!!!!!

Monday, August 29, 2011

7th Semester Lab Records

Hey folks..Well I guess we did it!All ur lab worries are over!We have finally uploaded Machines lab and PSE Lab record of a senior,so that should end your woes on lab stuff a lot.Now personally i have felt the crunch of not having a record to check up my values for any error in my readings since my first year..So i really believe this will help u guys a lot!
PS:We made each Experiment as a zip file(Rar actually,should work perfectly if u have winrar!).Anyway you will be able to see the pics after u extract the rar file.Each Rar file is named after the experiment,so you won't have to search up a lot!
This Link is in Reference to the Digital Copy of the Electrical Machines II Lab Record
Click here to download

This Link is in Reference to the Digital Copy of the Power Sytems Lab Record
Click here to download

Disclaimer:We accept no liability to the contents nor to the consequences of actions taken by the lab in charge teachers.This Material is Presented as a Resource for checking up with your observed values in the lab.We cannot guarantee its complete veracity..because well we are not sure ourselves..Just Kidding!This Stuff should be okay,but don't depend on it too much.Anyway Good Luck to your labs !!!

Downloading all Photos as a single Zip File

Hey Everyone,I am posting this because there have been requests for an option for downloading all the photos in a folder.As you may be aware we hosted the photos in google docs,which by the way i believe is great for sharing stuff like these.Not many Know that there is an option for downloading all the files in a folder as a single Zip file.I will just give a walk-through.
P.S You have to be logged into your Google account to do this.If u are not,you will be able to download each image one at a time.

1.Click on the link in the blog post.You will be redirected to google docs.
2.Click View Folder.You will be asked to log in to your google account.
3.You will be redirected back to google docs.Now click on the Button with a Tick mark on it.It Should be right above the Photos List.Select All Visible.Or u could just tick all the required photos.
4.Click On More Actions button and click Export.
5.Another Dialog Box will come up.Since these are photos There is no point in converting it into Ms Office Or Pdf Formats.Select As is Option.
6.Click Download.And Voila!!You should have the Zip Containing the photos in your download folder.

Another request We had was on the Kb size of the Photos.I am really sorry But Picture Quality is a huge Priority for us.Happy Downloading Again!!

Sunday, August 28, 2011

KERALA UNIVERSITY ELECTRICAL ENGINEERING SYLLABUS

In response to popular request we have uploaded a digital copy of Electrical Engineering Syllabus(All semesters).

Click here to get it

PSE lab previous year question papers

As per the requests from lot of users, we are uploading a single pdf file which contains all last year questions with a size of just 172KB.Click here to download.

Machines Lab II previous year question papers

Here we are uploading the 2009 question papers of Machines Lab.
Click here to download

Saturday, August 27, 2011

MIPOWER videos

Here we are uploading some videos of Mipower experiment (3 bus load flow, 5 bus load flow, short circuit).  This is only a sample set of 3 videos to show what all you need to do to set the bus/transmission line/transformer/generator/loads before computing short ckt & load flow analysis. The values in this video such as bus voltage,power,etc are chosen randomly and have no relation with any qn. It just shows the method to do. I think it will be a help to all those  who had only a vague idea of Mipower and where imagination was everything.
Special Thanks to SUBIN KOSHI...


NOTE : Open the file 3busloadflow.dap with VLC or KM player. Please do not rename the file. Also download the notepad file.

CLICK HERE TO DOWNLOAD

Friday, August 26, 2011

MACHINES LAB PHOTOS

Here you can find some photos of the terminals of many machines in our lab. This will definitely help you to have an idea about the connections and terminals of machines.
These photos are contributed by Aswin Das and also special thanks to Rejith Raj.

CLICK HERE FOR PHOTOS

Thursday, August 25, 2011

S8 LAB RECORD - S&C LAB

Here we have uploaded the photos of S&C lab record(senior's record). Total 17 experiments are uploaded. You can refer it for writing rough record and checking your output or values.

PS:We made each Experiment as a zip file (Rar actually,should work perfectly if u have winrar!). Anyway you will be able to see the pics after u extract the rar file. Each Rar file is named after the experiment,so you won't have to search up a lot!

Click here to view experiments

Click here to download entire record            size: 43.3 MB

Wednesday, August 24, 2011

IV report..cntd

This report covers
1)KALLADA HYDRO ELECTRIC PROJECT, KSEB, THENMALA
2)POTHENCODE 220KV SUBSTATION,
3)PEPPARA GENERATING STATION THIRUVANANTHAPURAM

Click here to download..

PS LAB PHOTOS AND VIDEOS

Here we are uploading photos of instruments of PS LAB. You can refer these pictures for getting an idea about the connections and terminals of all devices.
Special thanks to Rejith Raj (Photographer) and Subin Koshi (Camera).

click here for photos

This is a video about the Experiment on Static Relays using Sverker 750. This video will help you a lot in understanding the connections and procedure of the experiment. There are 2 videos (High Quality (89 MB size) and Medium Quality (16 MB size) )..Download any of them and take care to use VLC media player or any other advanced players for playing the video.
Special Thanks to Nithin Chacko(Videographer),Aswin Das(Actor) and Harikrishnan R(Commentator).

click here for video

ALL THE BEST FOR LAB EXAMS .....

MATLAB Experiment in PS Lab

We are uploading the correct diagram for the Power System Modelling Experiment in PS lab using MATLAB. There are some changes from the usual diagrams that we are drawing in the Fair records.Study this diagram.Sure Output Figure!!!...The values of the constants and parameters are also given.
Also the Output of that figure is given in the form of Graph. Refer this before your lab exams.
Prepared by Faizal P.S. and Danny John Kurian.
ALL THE BEST FOR LAB EXAMS...
click here to download

Tuesday, August 23, 2011

Tips to prepare the seminar report...?

Friends, here are some tips on how to prepare your seminar report.
  • Preferred font for the report is ARIAL size 12
  • Spacing between lines should be 1.5.
  • A header containing the name of the seminar should be present.
  • Footer should include the college name.
  • No need for underlining the headings.
  • Equations should be edited using equation editor and numbered.
  • Captions for the figures should be present and should be of the same size as the content.
  • The content should be aligned using justify option.
Inorder to help you guys, we have taken some photos of previous year's seminar report.
Click here to download.
Click here to download zip file.
The above format was suggested by Ushakumari Ma'am. She said to exactly recreate the format of the report shown in the pics..
So friends have a great time preparing the report..Hope this helped..!!!

Saturday, August 13, 2011

IV Reports

5Here you can find the IV reports of the following places :
           (i) LOAD DISPATCH CENTER, Kalamassery, Kochi.

          (ii) TRACO CABLE COMPANY LTD, Irimpanam, Kochi.
         (iii) GAS INSULATED SWITCHGEAR SUBSTATION, LA Complex, Trivandrum.
         (iv) BOMBAY SUBURBAN ELECTRICAL SUPPLY, Udyogamandal, Kochi.

click here to download
 Size : 115 KB.
 This also includes the facing sheet and other necessary pages.
To be submitted in the next week.

Prepared by Tini,Sithara,Sandhya,Shilpa and Divya.

Friday, July 29, 2011

Machines Lab Record

Hey folks..Well I guess we finally have done it.All ur worries are over.We have finally uploaded Machines lab record of a senior along with the PSE Lab record,so that should end your woes on lab stuff a lot.Now personally i have felt the crunch of not having a record to check up my values for any error in my readings since my first year..So i really believe this will help u guys a lot!
PS:We made each Experiment as a zip file(Rar actually,should work perfectly if u have winrar!)
Disclaimer:

CLICK HERE TO DOWNLOAD

PSE-III ASSIGNMENT 20th SEPT 2010

This is in reference to the assignment on Power System Engineering-III in S7E2.

CLICK HERE TO DOWNLOAD


Last Date for Submission: 20th September 2010
Reference: Power System Engineering by Nagarath and Kothari.

PSE-III 3rd ASSIGNMENT 27th Sept 2010

This is in reference to the assignment on Power System Engineering-III in S7E2.

CLICK HERE TO DOWNLOAD

Last Date for Submission: 27th September 2010
Reference: (i)Power System Engineering by Nagarath and Kothari.
(ii)Electrical Power Systems by Wadhwa.
(iii)Electrical Power Systems by J.B.Gupta.

Prepared by: JITHIN MOHAN K. and PRASHANTHI A.

Robotics Assignment 4th October 2010

This is in reference to the assignment on Robotics.

CLICK HERE TO DOWNLOAD

Last Date for Submission: 4th Oct 2010.
Reference : (i) Introduction to Robotics Analysis,Systems,Applications by Saeed B. Niku
(ii)Fundamentals of Robotics by Shilling.
Prepared by Gopika L. and Rince T.R.

EC Assignment- 27 sept

This is in reference to the EC assignment to be submitted on september 27nth in s7 E1....

Note: Please write the assignment with as much variety as possible i.e like rearranging the order of questions, shrinking the answers etc etc. This is to ensure that the assignment doesn't get cancelled due to mass copying. Make it as unique as possible..:-)
Give due credit to the persons who prepared the assignment..

IMP: The assignment is not yet completed. Those who prepared the assignment couldn't get the material for the complete set of questions..Rest have to be completed on your own or complete it tomorrow..
Two pages are missing. One is after the first photo and the second one after the 4th photo..willl upload them soon..
Click here to download. LINK
Download as a zip file: LINK

Last date: 27 september 2010
Prepared by: Parvathy & Srinidhi

Control System-I Assignment 11th Oct 2010

This is in reference to the assignment on Control System-I in s7E2.

CLICK HERE TO DOWNLOAD

Last Date for Submission: 11th Oct 2010.
Reference : Control Systems by Nagoorkani.
Special Thanks to LH Girls.
NB: Write this assignment in paper.

IEM Assignment 11th Oct 2010

This is in reference to the assignment on IEM in s7E2.
CLICK HERE TO DOWNLOAD

Last Date for Submission: 11th Oct 2010.
Prepared by Prashanthi A. and Nidhila Dinesh.

Tuesday, March 22, 2011

Friday, March 18, 2011

PSD ASSIGNMENT QUESTIONS FOR E2

PSD assignment questions for E2 has been uploaded(single zip file).
To be submitted on 23-03-2011 during PSD hour.

Click here to view

Thursday, March 17, 2011

PSD Assignmnt For E1

To be submitted on March 18..
Prepared by Parvathi
Click here to download..

Monday, March 14, 2011

DSP 1st Assignment..For E1

To be submitted on March 15..
Prepared by Meera..

PS: In total there are 7 Qns..The last qn is incomplete..Will upload it as soon as i get hold of the material..

Click here to download..

Monday, March 7, 2011

ESD Assignment No.1 for S8E2

Click here to download answers of the 1st series questions.
Write in a separate long book.
Assignment submission date: 08-03-2011

PS:- Only 6 questions uploaded. Remaining on the way. Keep checking.

Wednesday, March 2, 2011

PSD ASSIGNMENT II S8E2

Here you can find the pics of semiconverter and fullconverter waveforms..
Click here to download

Note: Draw the circuit of semi-converter and full converter at the top of all the graphs

Monday, February 28, 2011

HV assignment for S8 E1

To be submittted on march 1..
Prepared by Meera

Click here to download...

Sunday, February 27, 2011

HV ASSIGNMENT 28 Feb 2011

Here you can find the pics of 2nd HV assignment in S8E2..
Total 13 photos..
Note: Write it in separate notebook..
Prepared by: Gopika L.

click here to download

Friday, February 25, 2011

Finally..Its done..

Here is it..The much awaited t-shirt xclusive for our batch...



Please note that the T-shirt will be a full sleeve one with Hood(cap) at the back..
Post your comments here..

Monday, February 14, 2011

GATE 2011 answer key

Here you can find the pdf containing answers to all sets of question papers of EE.
Got it from iesacademy.com
click here to download

Sunday, February 13, 2011

ESD assignment for E1

To be submitted on Monday Feb-14.
Prepared by Diana
Click Here to download

ACT Assignment for E1

To be submitted on monday FEB-14
Source: Nagoor Khani
Camera work: Chacko

Click Here to download

Sunday, February 6, 2011

ACT assignment 7th Feb 2011

This is in reference to the assignment on ACT in s8E2.

NB: LEAVE SPACE FOR 3rd QUESTION
( 4 or 5  pages)

Last Date for Submission: 7th Feb 2011.
Write the assignment in seperate small notebook.
Assignment prepared by RINCE T.R.
Reference :  Advanced Control Theory, NagoorKani

click here to download
 

EMD Assignment for E1

To be submitted on Monday..FEB-7...
Prepared by Anupama..
Click here to download..

Saturday, February 5, 2011

DSP Assignment 7th Feb 2011

This is in reference to the assignment on DSP in s8E2.
Last Date for Submission: 7th Feb 2011.
Write the assignment in DSP notebook (front or back).
Assignment prepared by RINCE T.R.
Special thanks to Shanker Ganesh
Reference : Continuous time signals and systems,  J.S.Chitode
                  Digital Signal Processing,  P.Ramesh Babu.
 
click here to download

Monday, January 24, 2011

T-Shirt Xclusively fr Final yr Electrcls..Its jus round de corner..!

Guys...The T-shirt is coming out soon..But before that we need some information from you..And that too ASAP.
So we have created a survey..Please complete the survey..

Points to be noted while completing the survey:
1. Enter only correct information.
2. Once entered and after you submit your survey the answers cannot be edited. So be careful.
3. Attempt the survey only once. Multiple entries from the same person will create difficulties for us.
4. If any error or problem have occurred please state the problem in the comment box provided below this post.

Click here to start the survey..

Hope all the 120 guys in electrical attempt the survey..Please pass on this info among your friends..
Have a nice day..:-)

Sunday, January 23, 2011

EMD ASSIGNMENT 31 January 2011

This is in reference to the assignment on EMD in s8E2.
Last Date for Submission: 31st Jan 2011.
Write the assignment in Assignment notebook.
Assignment prepared by Jithin Mohan K.
Special thanks to Aswin Mohan.

click here to download size : 4.33 MB (single zip file)

HV assignment for E1

This is in reference to the assignment on HV in s8E1.
Last Date for Submission: 24th Jan 2011.
Write the assignment in assignmnt notebook.
Assignment prepared by Anupama ..

NOTE: Please write the assignment with as much variety as possible i.e like rearranging the order of questions, shrinking the answers etc etc. This is to ensure that the assignment doesn't get cancelled due to mass copying. Make it as unique as possible..

Click here to Download

Saturday, January 15, 2011

PSD Assignment 17 January 2011

This is in reference to the assignment on PSD in s8E2.
Last Date for Submission: 17th Jan 2011.
Write the assignment in notebook.
Assignment prepared by Subin Koshy.

Note: Now we have uploaded answers of 9 questions. Rest we will upload later. Please write the assignment with as much variety as possible i.e like rearranging the order of questions, shrinking the answers etc etc. This is to ensure that the assignment doesn't get cancelled due to mass copying. Make it as unique as possible..

click here to download

Monday, January 3, 2011

ESD assignment for E1...

ESD Assignment
To be submitted from tomorrow..
Roll nos 1-10 : Jan 4
11-20: Jan 5
21-30: Jan 6
31-60: Jan 7

Prepared by : ASHWIN MOHAN

Page 1 2 3 4 5 6 7 8 9 10 11 12

Click here to download as a rar file.

Saturday, January 1, 2011

EMD assignment for E1

We are back in action..Its S8 and its time for assignmnents..
Here we go...
EMD ASSIGNMENT for E1...
TO be submitted on JAN 3rd at 9:00 am..

Prepared by Vishnu M....

Individual pages....
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8

Click here to download as a single zip file...